[Students] Electrical Shutdown October 11 for Student Center Construction

Joan Lawrence Joan_Lawrence at tamu-commerce.edu
Wed Oct 8 14:06:58 CDT 2008


 

 

 

Saturday afternoon, October 11, from 3:30 PM to 7:30 PM, the contractor
for the new Student Center will be replacing the main electrical switch
for the new Student Center and Science Buildings.  This will require an
electrical shut down for the most of the Campus.  The only buildings on
the main Campus not affected will be BA, MSC, T-Lounge, and the Stadium.
None of the Residence Halls, except the F-Dorms, will be without
electricity.

 

The actual outage should last only 3 hours, but the contractor is
allowing some extra time for contingencies.  We regret the inconvenience
and will restore power just as soon as possible.

 

 

James C. Patton, AIA

Facilities Project Manager

Texas A&M University - Commerce

Phone: 903-468-8759

Jim_Patton at tamu-commerce.edu <mailto:Jim_Patton at tamu-commerce.edu> 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.tamuc.edu/pipermail/students/attachments/20081008/05664509/attachment.htm


More information about the Students mailing list